Festoon-less
Festoon-less Systems eliminate the need for control festoon cables, track and hardware. A receiving unit is location on the bridge control panel and another receiving unit on the hoist / trolley. A single transmitter operates all function. These system are also available for multiple hoist / trolley configurations.